银行aix 7

AIX 7 is coming!

AIX 7 is coming!
                                                                                 IBM plans to deliver the next version of the AIX® operating system, AIX 7, and new releases of PowerVM™ and PowerHA SystemMirror for AIX. These new offerings are designed to help companies reduce cost, improve service and lower the risk of deploying and migrating applications to AIX on Power® Systems.
The new capabilities planned for AIX 7 are designed to expand the scalability, reliability and manageability of AIX and the applications running on AIX. Key features will provide greater vertical scalability of up to 1024 threads or 256 cores in a single partition, a clustering infrastructure designed to provide highly availability applications with PowerHA SystemMirror and to simplify management of scale-out workloads. Additional AIX 7 will include new management capabilities based on IBM Systems Director that are designed to simplify the management of AIX system configuration. Finally AIX 7 will support the ability to run AIX 5.2 inside of a Workload Partition to allow consolidation of old workloads on new systems.
AIX 7 is planned to be supported on IBM Power System servers based on POWER4™, POWER5™, POWER6™ and POWER7™ processors. AIX 7 is planned to include exploitation that takes full advantage of POWER7 processor-based servers.
AIX 7, like AIX 6, is planned to provide binary compatibility for application programs developed on previous versions of AIX as long as the programs comply with reasonable programming standards.
AIX 6 binary compliance statement
AIX 7 continues the evolution of UNIX that began more than 25 years ago with the release of AIX V2.1, and builds on the earlier generations of AIX in a non-disruptive evolutionary approach.
IBM intends to provide early access to AIX 7 via an Open Beta program later this year.
AIX 7, with the planned new releases of PowerVM and PowerHA SystemMirror, is designed to deliver the intelligent, interconnected information technology infrastructure needed for a smarter planet.
参与23

23同行回答

zhenzongjianzhenzongjian软件开发工程师na
得靠ibm自己来推广显示全部
得靠ibm自己来推广收起
互联网服务 · 2010-07-21
浏览1231
benshifubenshifu系统管理员良艺泰通
顺应时代显示全部
顺应时代收起
零售/批发 · 2010-07-19
浏览1242
zhenzongjianzhenzongjian软件开发工程师na
7出来的太快了吧显示全部
7出来的太快了吧收起
互联网服务 · 2010-07-19
浏览1205
天生杀人猫天生杀人猫系统运维工程师联通系统集成有限公司
AIX6还没稳定呢,怎么也得等AIX6出到.6版本以上才敢打面积使用。显示全部
AIX6还没稳定呢,怎么也得等AIX6出到.6版本以上才敢打面积使用。收起
系统集成 · 2010-07-17
浏览1310
ibmfenghuaweiibmfenghuawei系统分析师ibmfenghuawei
:(unix正在被windows蚕食,ibm还能撑多久呀显示全部
:(unix正在被windows蚕食,ibm还能撑多久呀收起
系统集成 · 2010-07-16
浏览1225
myguangzhoumyguangzhou技术经理Uniwise
怎么感觉和MS一样啊XP用的好好的,就出了个鸡肋VISTA(是这样拼写的吗),结果没人用,这下又出来WIN7显示全部
怎么感觉和MS一样啊
XP用的好好的,就出了个鸡肋VISTA(是这样拼写的吗),结果没人用,这下又出来WIN7收起
互联网服务 · 2010-07-16
浏览1248
zhenzongjianzhenzongjian软件开发工程师na
hp的技术更新的就是慢啊...(特例)显示全部
hp的技术更新的就是慢啊...(特例)收起
互联网服务 · 2010-07-16
浏览1273
zhenzongjianzhenzongjian软件开发工程师na
应该不会发布那么快吧...计算机技术革新速度就是快啊显示全部
应该不会发布那么快吧...

计算机技术革新速度就是快啊收起
互联网服务 · 2010-07-16
浏览1219
青山松青山松系统运维工程师传媒
能下到测试版?显示全部
能下到测试版?收起
媒体出版 · 2010-07-15
浏览1219
it_civilianit_civilian技术经理sap
距发布越来越近了显示全部
距发布越来越近了收起
IT分销/经销 · 2010-07-15
浏览1230

提问者

myciciy
IT顾问某金融科技公司
擅长领域: 服务器存储灾备

相关问题

问题状态

  • 发布时间:2010-06-08
  • 关注会员:0 人
  • 问题浏览:11280
  • 最近回答:2010-07-21
  • X社区推广